Must-read before purchasing: About the used maxmill Processing Center

Author:J           Date:2025-12-16

Faced with numerous used maxmill machining centers on the market, how can you professionally select a high-quality machine tool, rather than a problematic one? Mastering the following key evaluation steps will make your purchasing decision more sound and secure.

Step 1: Thoroughly Investigate History and Records. Ideal equipment should have a complete "resume": year of manufacture, original industry (e.g., mold making, mass production of parts), work shift (single shift or 24-hour continuous operation), maintenance records, etc. Prioritize equipment retired from large enterprises or foreign companies, as they are usually well-maintained and used in better environments. Request clear photos of the machine's nameplate and the interior of the electrical cabinet, verifying core information such as system model and spindle model.

Step 2: Conduct Comprehensive Static and Dynamic Testing.

Static Accuracy Testing: Use professional tools such as laser interferometers and ballbars to test the machine tool's positioning accuracy, repeatability, and backlash. This is a "health check report" measuring the machine tool's core performance.

Mechanical Condition Inspection: Inspect the wear of the guide rails and lead screws for rust and scratches; check the spindle's temperature rise, vibration, and noise during high and low speed operation; check the smoothness and absence of abnormal noises during manual movement of each axis.

Functional Testing: Conduct comprehensive testing of all functions of the CNC system, including G/M code execution, tool changer operation (continuous tool changes hundreds of times to test stability), coolant, pneumatic/hydraulic systems, etc. Actual cutting tests are essential to verify the surface finish, dimensional accuracy, and contour accuracy of the machined parts.

Step 3: Assess the remaining life of core components. Focus on the spindle and lead screw. Use instruments to detect spindle radial runout and axial movement; determine if the lead screw preload has been lost. Inquire about the usage hours of these core components or whether they have been refurbished. Replacing a completely new spindle or lead screw is costly and must be included in the total cost of ownership.

More Articles