How to ship used NAKAMURA abroad?

Author:J           Date:2025-11-11

Step 1: Professional Factory Preparation and Precision Packaging

This is the most crucial step in the entire process, directly determining the condition of the used NAKAMURA upon arrival.

Professional Disassembly and Protection: Performed by experienced technicians. This includes:

Draining lubricating oil and coolant from the spindle, guide rails, lead screws, etc.

Disassembling potentially movable components, such as the turret's tool holder, tailstock, and overall protective cover, and individually packaging and securing them.

Using specialized tooling to firmly lock all linear and rotary axes to prevent movement or impact during transportation.

Performing rust-proofing and moisture-proofing treatment on precision components such as the spindle, guide rails, and linear encoders.

International Standard Wooden Crate Packaging:

Chassis: The equipment must be secured to a sturdy wooden chassis using shock-absorbing pads, ensuring no direct contact with the bottom of the crate.

Internal Protection: The entire equipment is wrapped in plastic film for moisture protection, and sufficient desiccant is placed inside.

External Wooden Crate: The wooden structure must be robust enough to withstand stacking and bumps. The container should have clear markings indicating lifting, rain protection, tipping prevention, and center of gravity.

Step Two: Choosing the Correct International Trade and Transportation Method

Determine the Transaction Terms: Clarify the division of responsibilities between the buyer and seller. For exports, FOB or CIF terms are typically used. You are responsible for safely transporting the equipment to the designated port and handling export customs clearance.

Choose a Reliable International Freight Forwarder: It is strongly recommended to hire a freight forwarder specializing in the export of large machinery and equipment. They can provide the following services:

Transportation Method: Choose full container load (FCL) or less-than-container load (LCL) shipping based on the size and weight of the equipment. NAKAMURA typically requires a 40-foot high cube container or open top container.

Booking and Documentation: They will be responsible for booking space with the shipping company and guiding you in preparing a complete set of export documents.

Step Three: Handling Export and Destination Country Import Customs Clearance

China Export Customs Declaration:

Commodity Code: Determine the correct HS code for the machine tool.

Document Preparation: Typically, a contract, invoice, packing list, customs declaration form, and customs declaration authorization are required.

Regulatory Documents: Depending on the machine tool's year, technical specifications, and destination country, an "Outbound Goods Clearance Certificate" may be required, or export control reviews may apply.

Destination Country Import Clearance:

This is primarily the buyer's responsibility, but your full cooperation is required.

Document Provision: You need to provide the buyer with complete commercial documents.

Understand Destination Requirements: Different countries have different regulations, which may involve import licenses, quality inspections, anti-dumping duties, etc.

Step Four: Transportation Insurance and Destination Placement

Purchase Comprehensive Transportation Insurance: Insurance is essential, preferably all-risk insurance, clearly specifying coverage for risks such as bumps, moisture, rust, and improper loading and unloading.

Destination Port Delivery and Placement:

After the equipment arrives, the buyer or their agent is responsible for customs clearance and pickup.

It is strongly recommended to arrange or recommend a professional equipment installation company for unloading, unpacking, installation, leveling, and precision restoration. This is as important as the factory packaging.

More Articles